Huawei H12-425_V2.0-ENU Practice Exams
Last updated on Oct 22,2026- Exam Code: H12-425_V2.0-ENU
- Exam Name: HCIP-Data Center Facility Deployment V2.0
- Certification Provider: Huawei
- Latest update: Oct 22,2026
UPS5000-E (50kVA module) series UPS does not derate backup power, the number of 12V batteries in the following configuration, which is unreasonable?
- A . Section 34
- B . Section 38
- C . Section 40
- D . Section 36
Is there a skylight in the channel of FusionModule800?
- A . None
- B . have
UPS5000-S-400K adopts () KVA power module.
- A . 25
- B . 30
- C . 40
- D . 50
Which of the following statements are true about the dry contact card of the integrated UPS?
- A . After the BCB port of dry contact card is connected, the BCB port can be used only if t is enabled on the monitoring software.
- B . The EPO port can be normally open or normally closed.
- C . The UPS dry contact card can be used to detect the switch status of the battery system.
- D . The dry contact card cannot detect the status of an external battery switch.
Which of the following are components of NetCol8000-E220?
- A . Indirect heat exchange system
- B . Mechanical auxiliary cooling system
- C . Spray System
- D . Electric control system
When configuring the battery, do not consider the brand of the battery, as long as the capacity is the same, it can meet customer requirements.
- A . True
- B . False
When the outdoor temperature will be lower than () degree, the outdoor unit of the air-cooled air conditioner needs to be equipped with low temperature components.
- A . -10
- B . -20
- C . -15
- D . -25
Which of the following does the UPS5000-E-400K-FM input line voltage support? (Multiple choice)
- A . 220V
- B . 380V
- C . 400V
- D . 415V
The damage of NETCOL5000-C thermal insulation cotton may cause:
- A . The fan noise is too loud
- B . The drainage capacity of the equipment is significantly reduced
- C . Pipeline condensation
- D . The fan is blocked