The output terminals of the LPS2000-G-6/10/15/20K include sL and pL.
Which of the following statements about the terminals is false?
- A . When UPSs are connected in parallel, connect loads to the pL terminal.
- B . When a single US works and loads are of the same importance connect all loads to the sL terminal.
- C . When a single UPS works and lauds are divided into two levels connect the primary load to the sL terminal and the secondary load to the pL terminal
- D . When the UPS is overloaded, the loads connected to the sL terminal il be powered of first to ensure continuous power supply to the loads connected to the pL terminal.
FusionModule800 version 3.0 supports face recognition function.
- A . True
- B . False
When the power density of a single cabinet is greater than 10kl/R, which cooling method is recommended?
- A . Room-level air conditioning
- B . Row-level air-conditioning horizontal air supply airtight channel.
- C . Unsealed channel for horizontal air supply of row-level air conditioner
- D . Downstream air from room-level air conditioners
For storage batteries that have been stored for 18 months or more and have not been charged during the period, what should be dealt with?
- A . No need to deal with, use as soon as possible
- B . Need to supplement point processing, use it as soon as possible
- C . Need to be activated, use as soon as possible
- D . do scrap treatment
Batteries of different capacities, different specifications, different batches and different manufacturers cannot be mixed in the same group of batteries.
- A . True
- B . False
What is the maximum IT load supported by the FusionModule2000 integrated UPS?
- A . 50kW
- B . 125kW
- C . 150kW
- D . 75kW
The optional temperature and humidity sensor for the UP55000 cannot be cascaded.
- A . True
- B . False
The power system of a UPS2000-G-15K at a site is three-phase input and single-phase output. After installation, it is found that the mains and bypass inputs are three-phase, the output is single-phase, and the mains and bypass inputs share a power source.
Which of the following statements are true about the UPS wiring mode?
- A . The wiring mode is incorrect, if the upstream mains input switch is turned on, the UPS will be
short-circuited and damaged immediately. - B . The wiring mode is correct. The UPS can start properly.
- C . The wiring mode is incorrect. The UPS cannot work in battery mode, but can still work in bypass mode or inverter mode.
- D . The wiring mode is incorrect. The correct wiring mode should be single-phase bypass input, three-phase mains input, and one power source.
The ECC800 does not support the function of sending alarm information by email.
- A . True
- B . False
Which of the following air-conditioning systems need to be equipped with cooling towers and dry coolers?
- A . Direct Ventilation Air Conditioning System
- B . DX air-cooled type
- C . CW air-cooled type
- D . DX water-cooled type