Huawei H19-321_V2.0 Practice Exams
Last updated on Oct 23,2026- Exam Code: H19-321_V2.0
- Exam Name: HCSA-Presales-Service V2.0
- Certification Provider: Huawei
- Latest update: Oct 23,2026
When a customer purchases maintenance for a set of S5500T storage devices, he is allowed to purchase the gold + maintenance package for the main control frame and the standard + maintenance package for the hard disk frame.
- A . True
- B . False
Which of the following aspects does Huawei’s WDM network assessment service assess? (Multiple choice)
- A . Network performance
- B . Online resources
- C . Network reliability
- D . Network management and maintenance
- E . Equipment health check
IP planning and design services are more practical than planning consulting services. The former focuses on detailed design, while the latter focuses on top-level architecture consulting.
- A . True
- B . False
The customer’s old version of network management T2000 has been EOS, and now a new set of U2000 is purchased to replace the original T2000. Which of the following professional services will be involved?
- A . Network management expansion
- B . Equipment Upgrade
- C . Network management data migration
- D . Equipment Relocation
Which of the following maintenance service packages provide 7*10*ND spare parts pre-replacement (spare parts first) service? (Multiple choice)
- A . Standards
- B . Silver
- C . Gold Medal
- D . Standard+
- E . Silver +
- F . Gold Medal +
All transmission ASON projects must quote design professional services.
- A . True
- B . False
Huawei Service Solution Pre-sales Expert Certification is one of Huawei’s five professional certifications.
- A . True
- B . False
What is not included in the daily management and maintenance of disaster recovery?
- A . Condition Monitoring
- B . Disaster recovery performance monitoring
- C . Regular ORP drills
- D . Disaster recovery design plan
Which of the following does not belong to the content of big data development support services?
- A . Parameter Configuration Guide
- B . API Guidance
- C . Data Integration
- D . Table Design Guidelines
eLTE broadband access network planning, design, evaluation and optimization tools include (). (Multiple choice)
- A . RND
- B . OMStar
- C . U-Net
- D . NaStar
- E . U2000 /eSight
- F . Probe &Assistant