DELL EMC D-VXB-DY-A-24 Practice Exams
Last updated on Oct 21,2026- Exam Code: D-VXB-DY-A-24
- Exam Name: Dell VxBlock Deploy Achievement
- Certification Provider: DELL EMC
- Latest update: Oct 21,2026
In addition to the Final Test Plan and Customer Satisfaction Survey, what document/form is required to be signed by the customer at the Project Closure Meeting?
- A . Milestone Completion Form
- B . Final Project Signoff
- C . Project Workbook
- D . Project Feedback Form
B
Explanation:
Review Project Closure Documents: The project closure phase involves several key documents that need to be reviewed and signed off to formally close the project1.
Identify Required Document: In addition to the Final Test Plan and Customer Satisfaction Survey, the Final Project Signoff is a crucial document that must be signed by the customer at the Project Closure Meeting1.
Understand the Significance: The Final Project Signoff serves as the customer’s formal acceptance of the project deliverables and confirms that all contractual obligations have been met1.
Ensure Compliance: It is important to ensure that the Final Project Signoff is completed and signed by the customer to officially close the project and release the project team from further responsibilities1.
What is the standard expected timeline to complete an RCM upgrade?
- A . 2 months
- B . 8 business days
- C . 6 weeks
- D . 3 weeks
D
Explanation:
The standard expected timeline to complete an RCM (Release Certification Matrix) upgrade is 3
weeks. This timeline accounts for the necessary planning, execution, and validation steps to ensure a
successful upgrade.
Reference: Dell EMC RCM upgrade process documentation.
Best practices for system upgrades.
A customer has an existing ACI fabric. Their management has decided to invest in NSX for virtual networking but also retain ACI for their customers and for physical networking.
What is a consideration?
- A . This solution is not possible. ACI takes care of virtual and physical networking.
- B . The customer will need to provide traditional tree network environment for NSX because only ACI works with the spine and leaf model.
- C . This solution is possible. The ACI APIC can be deployed as a virtual machine in virtual mode.
- D . This solution is possible but may be cost prohibitive.
D
Explanation:
Integrating NSX for virtual networking while retaining ACI for physical networking is possible, but it may be cost prohibitive. This approach requires careful planning and management of both virtual and physical network environments, potentially leading to higher operational costs and complexity.
Reference: Technical resources on integrating VMware NSX with Cisco ACI.
Cost considerations and best practices for hybrid network environments.
You are deploying a VxBlock system with Cisco ACI.
What is a consideration?
- A . A minimum of two uplinks per leaf switch is recommended
- B . Fabric load balancing is achieved using VXLAN
- C . Leaf switches use 40 GbE vPC peer links
- D . Leaf switches connect to spines using 10 GbE links
A
Explanation:
Review Cisco ACI Deployment: When deploying a VxBlock system with Cisco ACI, it’s important to consider the physical connectivity and redundancy within the fabric1.
Consider Uplinks for Leaf Switches: For leaf switches in a Cisco ACI fabric, having a minimum of two uplinks is recommended to ensure redundancy and resiliency1.
Understand Fabric Load Balancing: While VXLAN is used within Cisco ACI for fabric load balancing, the consideration here is specifically about the physical uplinks from the leaf switches1.
Reference Official Documentation: The Official Dell VxBlock Deploy Achievement document provides guidelines for deploying VxBlock systems with Cisco ACI, including considerations for leaf switch connectivity1.
A VxBlock 1000 is running VMware vSphere 6.7. To support an audit, a customer engineer is trying to map the networking components in the VxBlock to a traditional datacenter architecture.
Which component should the engineer map to the access switch?
- A . VMware virtual distributed switch
- B . Fabric Interconnect
- C . Nexus 1000V switch
- D . Nexus 9306PX switch
B
Explanation:
In a VxBlock 1000 system running VMware vSphere 6.7, the Fabric Interconnect should be mapped to the access switch in a traditional data center architecture. The Fabric Interconnect is responsible for aggregating traffic from the servers before it is sent to the upstream network, functioning similarly to an access switch which connects end devices to the broader network infrastructure.
Reference: Dell EMC VxBlock System architecture guides.
Cisco Unified Computing System (UCS) documentation, as Fabric Interconnects are commonly used in UCS environments.
What is a licensed feature of Isilon OneFS?
- A . InsightIQ
- B . SMARTCONNECT
- C . SMARTPOOL
- D . SynclQ
C
Explanation:
SMARTPOOL is a licensed feature of Isilon OneFS. It enables the automated tiering of data across different types of storage media within the cluster, optimizing performance and storage efficiency based on data usage patterns.
Reference: Dell EMC Isilon OneFS documentation.
Technical resources on Isilon features and licensing.
Which NSX security policy component applies rules to child policies automatically from the parent policies?
- A . Inheritance
- B . Rules
- C . Control
- D . Weight
A
Explanation:
Review NSX Security Policy Components: NSX security policies are a set of rules and services that can be applied to security groups within the NSX environment1.
Identify Inheritance Feature: The inheritance feature in NSX security policies allows for the automatic application of rules from parent policies to child policies1.
Understand Policy Hierarchy: By using inheritance, administrators can create a hierarchical structure of security policies where the child policies inherit all the rules and settings from their parent policies1.
Implement Inherited Policies: This feature simplifies the management of security policies by ensuring that any changes made at the parent level are automatically propagated to the child policies1.
Which document includes a complete list of tools used to perform a VxBlock 1000 upgrade?
- A . Converged Systems Administration Guide
- B . Converged Systems Expansion Guide
- C . Converged Systems Architecture Guide
- D . Converged Systems Physical Build Guide
A
Explanation:
The Converged Systems Administration Guide includes a complete list of tools used to perform a VxBlock 1000 upgrade. This guide provides detailed instructions and necessary resources for administrators to manage and upgrade VxBlock systems.
Reference: Dell EMC Converged Systems documentation.
Best practices for system upgrades and administration.
A customer is planning to integrate a VxBlock to a new Cisco ACI fabric.
What major physical connectivity change is needed if the customer intends to convert their existing VxBlock Nexus 9396PX switches to ACI mode?
- A . Connect the switch directly to the APIC to download the ACI software. Then connect the existing Nexus 9396PX switches to a spine Nexus 93180YC switch.
- B . Remove the dual peer link connection but keep the peer link connection for ACI fabric heartbeat traffic exchange.
- C . Connect the Nexus 9396PX switch to spine Nexus 9500 switches. Remove other connections
between the Nexus 9396PX switches. - D . Nexus 9396PX switch cannot be integrated directly to ACI fabric.
A
Explanation:
To convert existing VxBlock Nexus 9396PX switches to ACI mode, a major physical connectivity change involves connecting the switch directly to the APIC (Application Policy Infrastructure Controller) to download the ACI software. Afterward, the existing Nexus 9396PX switches should be connected to a spine Nexus 93180YC switch as part of the ACI fabric setup.
Reference: Cisco ACI deployment guides.
Dell EMC VxBlock system integration documentation.
According to the Test Plan guidelines, how should you validate redundancy capabilities of the network during a system failure?
- A . Remove one Aggregation switch power supply
- B . Disable the primary interface on Switch-A
- C . Power off the primary ToR switch
- D . Remove one power module from ToR switch A
C
Explanation:
Review Test Plan Guidelines: The Test Plan guidelines in the Dell VxBlock Deploy Achievement document outline the procedures for validating the redundancy capabilities of the network1. Understand Redundancy Validation: Redundancy validation involves testing the network’s ability to continue operating in the event of a component failure1.
Identify Redundancy Components: Top of Rack (ToR) switches are critical components that often have redundancy built-in to ensure network resilience1.
Execute Redundancy Test: To validate redundancy, the primary ToR switch is powered off to simulate a system failure. This tests the failover mechanisms and ensures that the secondary systems take over without service disruption1.
Document and Analyze Results: After the test, the results are documented and analyzed to confirm that redundancy measures are functioning as intended and that there is no loss of connectivity or service1.