DELL EMC D-NWG-DS-00 Practice Exams
Last updated on Oct 21,2026- Exam Code: D-NWG-DS-00
- Exam Name: Dell Networking Design
- Certification Provider: DELL EMC
- Latest update: Oct 21,2026
A customer is planning for a Cyber Recovery vault. They want the vault to have the strongest level of protection from external connections. The vault must be able to send out SMTP data out.
What device should be connected on the edge of the vault?
- A . Router
- B . Firewall
- C . Data Diode
- D . Air gap
A customer is planning for a Cyber Recovery vault. They want the vault to have the strongest level of protection from external connections. The vault must be able to send out SMTP data out.
What device should be connected on the edge of the vault?
- A . Router
- B . Firewall
- C . Data Diode
- D . Air gap
What key aspect of the scoping phase helps ensure that the network design meets financial and technical requirements?
- A . Hardware configuration
- B . Cost estimation using Financial Force
- C . Network monitoring tools
- D . Cable management
What is the purpose of verifying the EDP pre-deployment checklist before a network deployment?
- A . To ensure that all devices have the latest firmware
- B . To confirm the deployment is aligned with enterprise standards and policies
- C . To assign IP addresses to network devices
- D . To configure security policies
Which service option is typically included in a networking design project?
- A . OS installation on servers
- B . Data migration
- C . Network assessment and consultation
- D . Web application development
Which service option is typically included in a networking design project?
- A . OS installation on servers
- B . Data migration
- C . Network assessment and consultation
- D . Web application development
Which of the following are key considerations during Layer 3 (L3) network planning?
- A . Routing protocols
- B . IP address allocation
- C . VLAN segmentation
- D . Network topology
Which of the following are key considerations during Layer 3 (L3) network planning?
- A . Routing protocols
- B . IP address allocation
- C . VLAN segmentation
- D . Network topology
Which template is used to collect the security information for a project?
- A . ZTNA
- B . SONiC
- C . STIG
- D . NIST
Which tasks are performed during the scoping phase to align the network design with business requirements?
- A . Implementing network security policies
- B . Identifying project requirements and constraints
- C . Scheduling network monitoring solutions
- D . Installing routers and switches