DELL EMC D-NWG-DS-00 Practice Exams
Last updated on Oct 21,2026- Exam Code: D-NWG-DS-00
- Exam Name: Dell Networking Design
- Certification Provider: DELL EMC
- Latest update: Oct 21,2026
Which of the following is a common task performed by deployment support during a network installation?
- A . Monitoring traffic patterns
- B . Troubleshooting hardware and software issues
- C . Designing IP addressing schemes
- D . Performing vulnerability assessments
Which document is essential for verifying that all network components meet design specifications after installation?
- A . Post-Deployment Verification Template
- B . Pre-Deployment Checklist
- C . Security Policy Document
- D . VLAN Assignment Sheet
Match the following scripting tools with their respective functions in network design:
Tool
FastScript
Unisphere for PowerMax
Solve Online
EPS Tool
Function
A) Automates network configuration tasks
B) Monitors and manages network performance
C) Provides step-by-step guidance for maintenance
D) Estimates power and environmental requirements
- A . FastScript – A Unisphere for PowerMax – B Solve Online – C EPS Tool – D
- B . FastScript – A Unisphere for PowerMax – C Solve Online – B EPS Tool – D
- C . FastScript – A Unisphere for PowerMax – C Solve Online – D EPS Tool – B
- D . FastScript – D Unisphere for PowerMax – B Solve Online – C EPS Tool – A
What is the primary focus of the physical planning phase in network design?
- A . Configuring IP addresses for devices
- B . Identifying hardware locations and cabling paths
- C . Designing the network’s security architecture
- D . Assigning access control policies
Which of the following is a key element of Post-Deployment Verification?
- A . Configuring VLANs
- B . Verifying that the network’s performance matches the design specifications
- C . Assigning IP addresses
- D . Installing network cables
What is the Financial Force tool used for?
- A . Sales Planning
- B . Architect Designing
- C . Order Tracking
- D . Project Management
Which of the following tasks can be automated using FastScript in a networking project?
- A . VLAN configuration
- B . Routing table updates
- C . Device monitoring
- D . IP address assignment
A __________ template is used to capture the VLAN IDs, associated devices, and IP addressing for each VLAN in the network.
- A . Security Policy
- B . VLAN Assignment
- C . Troubleshooting
- D . Pre-Deployment Configuration
A customer project requires additional scaling based on increased application and server workloads.
What is recommended for the scaling?
- A . The VLTi links should be equal to or greater than the uplink bandwidth.
- B . Divide the total server count by two to determine the needed number of VLTi links.
- C . Use a minimum of one port using the fastest switch port.
A customer is planning for a Cyber Recovery vault. They want the vault to have the strongest level of protection from external connections. The vault must be able to send out SMTP data out.
What device should be connected on the edge of the vault?
- A . Router
- B . Firewall
- C . Data Diode
- D . Air gap