VMware 3V0-21.23 Practice Exams
Last updated on Nov 16,2026- Exam Code: 3V0-21.23
- Exam Name: VMware vSphere 8.x Advanced Design
- Certification Provider: VMware
- Latest update: Nov 16,2026
Which four factors should an architect consider when calculating the number of hosts required for a new multi-site vSphere-based solution that utilizes external storage? (Choose four.)
- A . The workload profile (CPU and memory) of each workload
- B . The amount of resources required for virtual machine (VM) swap and VM snapshots
- C . The number of existinq workloads that will be decommissioned prior to the completion of project
- D . The number of existinq workloads that will be miqrated onto the new solution
- E . The number of network connections per physical host server
- F . The future physical location of any workloads
- G . The hardware specification of the underlying infrastructure
An architect is reviewing the information gathered from an initial requirements gathering workshop.
The following requirements have been identified:
REQ001 C The architecture must support tracking of administrative logons and actions.
REQ002 C The architecture must support class three (three nines or 99.9%) system availability.
REQ003 C The architecture must report on system usage in terms of CPU, memory, storage and network.
REQ004 C The architecture must provide for system recovery point objective (RPO) of two hours.
REQ005 C The architecture must provide access to a precision time protocol (PTP) for time synchronization.
Which two of the listed requirements would be classified as business (formerly functional)
requirements? (Choose two.)
- A . The architecture must provide access to a precision time protocol (PTP) for time synchronization.
- B . The architecture must report on system usage in terms of CPU, memory, storage and network.
- C . The architecture must support class three (Three nines or 99.9%) system availability.
- D . The architecture must support tracking of administrative logons and actions.
- E . The architecture must provide for system recovery point objective (RPO) of two hours.
An architect is tasked with creating a design for a vSphere-based solution.
Reviewing requirements with the security team, the architect makes the following design decision:
ESXi hosts in the environment will enable shell sandbox for SSH connections and the local ESXi shell
What is an implication of the design decision to enable shell sandboxing?
- A . Only certain commands can be executed in the sandboxed shell
- B . Only administrative accounts can access the sandbox shell
- C . All commands executed in the sandbox shell will be logged
- D . The vSphere 8 hosts will operate in strict lockdown mode
A company has a requirement that all production applications must have a maximum tolerable downtime (MTD) of one hour per month.
Which statement would be included in the physical design to support this requirement?
- A . vSphere HA will be enabled on all clusters.
- B . vSphere HA Host Failure Response will be set to Restart VMs.
- C . vSphere Fault Tolerance (FT) will not be enabled for the production applications.
- D . Server hardware has already been purchased for the production applications.
An architect is responsible for designing a vSphere-based solution for a customer. The customer has the following requirement:
There should be no single points of failure within the solution.
Which three considerations regarding physical host design should an architect analyze when making network teaming-related design decisions? (Choose three.)
- A . NIC Teaming requires a minimum of three physical network connections.
- B . For NIC Teaming, all NICs in the same port group must be in the same layer 2 broadcast domain.
- C . To increase performance, the NICs within a NIC team should be from the same physical NIC Card.
- D . To increase availability, the NICs within a NIC team should be from different physical NIC Cards.
- E . NIC Teaming requires a minimum of two physical network connections.
- F . For NIC Teaming, all NICs in the same port group must be in the same routable network.
An architect is documenting the design decisions for a new vSphere solution. The following design decision has been made:
Create a separate vSphere cluster for the management workloads
What could the architect include as justification for this design decision?
- A . This increases operational overhead as multiple clusters are required for management and compute workloads.
- B . This increases capital expenditure as hardware must be purchased for multiple clusters.
- C . This ensures that compute workloads have no impact on the management workloads.
- D . This ensures that compute workloads have no impact on the management workloads.
An architect is holding a design workshop with a customer for a new solution.
The customer states that the new solution needs to provide the following capabilities:
Automated deployment and lifecycle management of the vSphere platform Self-Service deployment of virtual machines and other objects from a central catalog
Monitoring, logging and analytic tooling to provide visibility and troubleshooting of the whole solution
Support deployment via infrastructure-as-code methods for the additional management components
The customer also requests that the solution be as cost-effective as possible while still delivering a fast time to value for the organization.
Which design approach should the architect recommend to meet these requirements?
- A . Use VMware Validated Designs for the vSphere solution and VMware Validated Solutions for the additional components
- B . Use VMware Cloud Foundation for the vSphere solution and VMware Validated Solutions for the additional components
- C . Use VMware Cloud Foundation for the vSphere solution and a custom design for the additional components
- D . Use a custom design for the vSphere solution and VMware Validated Solutions for the additional components
An architect is tasked with helping a customer develop a design that meets the following requirements:
Must have no single point of failure
Must include thorough standard operating procedure documentation
Must use VMXNET3 virtual network interface card
Must have 99.9% uptime Service Level Agreement
Must use the latest version of VMware vSphere
Which two are considered constraints? (Choose two.)
- A . Must use the latest version of VMware
- B . Must have no single point of failure
- C . Must use VMXNET3 virtual network interface card
- D . Must include thorough standard operating procedure documentation
- E . Must have 99.9% uptime Service Level Aqreement
An architect is designing a new vSphere solution. The customer has stated that the solution will be used to host different types of applications, some of which have special considerations.
The customer has provided the following information in relation to the special considerations:
The applications are sensitive to the time it takes for CPUs to be accessible to process instructions The applications send and receive large amounts of data across the network
The applications are sensitive to the time it takes for the data to be sent and received at the destination
What could the architect include in the design for these considerations?
- A . Use vSphere Distributed Resource Scheduler (DRS) with affinity rules to keep the virtual machines on the same ESXi hosts
- B . Use vSphere Distributed Services Engine with Network I/O Control on the distributed switch
- C . Use vSphere Distributed Services Engine with Data Processing Units (DPUs) in the ESXi host hardware
- D . Use vSphere Distributed Resource Scheduler (DRS) with SmartNICs in the ESXi host hardware
An architect is designing a new vSphere solution. The following information has been gathered during the design workshops with the customer:
The solution will be deployed into two availability zones (AZs)
The solution will be configured as a single stretched cluster with shared storage across the two AZs Production and Development workloads will run across both AZs The cluster is configured as N + 1
The architect needs to ensure that, in the event of a host failure during maintenance of another host in the cluster, only the Production workloads are recovered.
What should the architect include in the design to meet this requirement?
- A . Configure vSphere HA VM Monitoring to VM and Application Monitoring
Set the VM monitoring sensitivity to Custom - B . Configure vSphere HA VM Monitoring to VM Monitoring only
Set the VM monitoring sensitivity to Preset of High - C . Configure vSphere HA Host Failure Response to Restart VMs
Set the Development VMs to Disabled as the Restart Priority - D . Configure vSphere HA Host Failure Response to Restart VMs
Set the cluster default Restart VM Restart Priority to Highest