UiPath UiPath-TAEPv1 Practice Exams
Last updated on Oct 21,2026- Exam Code: UiPath-TAEPv1
- Exam Name: UiPath Test Automation Engineer Professional v1.0 Exam
- Certification Provider: UiPath
- Latest update: Oct 21,2026
What are the two methods for executing tests and where are they invoked??
- A . Manual and semi-automated: invoked in Studio.
- B . Manual and Automated; invoked in Test Manager only.
- C . Manual and Scripted; invoked in Orchestrator only
- D . Manual and Automated; invoked in Test Manager and Orchestrator.
D
Explanation:
The two methods for executing tests in UiPath are Manual and Automated. These can be invoked from both Test Manager and Orchestrator, depending on whether the execution is user-triggered or scheduled/triggered via CI/CD.
A. Only the Test Manager can perform re-executions.
B. The pre-defined user roles that can perform re-executions are: Test Manager, Test Executor and Manual Tester.
C. Any user with access to the Test Manager can perform re-executions.
D. Only the Test Executor can perform re-executions.
Explanation:
In UiPath Test Manager, the ability to re-execute test executions is granted to specific pre-defined user roles, including Test Manager, Test Executor, and Manual Tester. These roles are designed to manage and validate test runs as part of the testing lifecycle.
Where should be navigated in UiPath Test Manager in order to configure a new Jira connection?
- A . Navigate to the External Connections tab within Admin Settings.
- B . Navigate to the Integrations tab within Admin Settings.
- C . Navigate to the Connection tab within Project Settings.
- D . Navigate to the Integration tab within Project Settings.
B
Explanation:
To configure a new Jira connection in UiPath Test Manager, you need to navigate to the Integrations tab within Admin Settings. This is where external ALM tools like Jira can be connected and managed centrally.
Where should be navigated in UiPath Test Manager in order to configure a new Jira connection?
- A . Navigate to the External Connections tab within Admin Settings.
- B . Navigate to the Integrations tab within Admin Settings.
- C . Navigate to the Connection tab within Project Settings.
- D . Navigate to the Integration tab within Project Settings.
B
Explanation:
To configure a new Jira connection in UiPath Test Manager, you need to navigate to the Integrations tab within Admin Settings. This is where external ALM tools like Jira can be connected and managed centrally.
In software testing what does the term "test case” refer to?
- A . It’s a set of conditions under which a tester determines if a system under test satisfies requirements and functions correctly.
- B . It’s the maximum load that the system can tolerate without crashing.
- C . It’s the process of executing the system to reveal bugs.
- D . It’s a written document outlining the detailed process of software development.
A
Explanation:
A test case is a set of conditions, inputs, and expected results used to determine whether a system under test behaves correctly and meets its specified requirements. It helps validate functionality and detect defects.
In software testing what does the term "test case” refer to?
- A . It’s a set of conditions under which a tester determines if a system under test satisfies requirements and functions correctly.
- B . It’s the maximum load that the system can tolerate without crashing.
- C . It’s the process of executing the system to reveal bugs.
- D . It’s a written document outlining the detailed process of software development.
A
Explanation:
A test case is a set of conditions, inputs, and expected results used to determine whether a system under test behaves correctly and meets its specified requirements. It helps validate functionality and detect defects.
In software testing what does the term "test case” refer to?
- A . It’s a set of conditions under which a tester determines if a system under test satisfies requirements and functions correctly.
- B . It’s the maximum load that the system can tolerate without crashing.
- C . It’s the process of executing the system to reveal bugs.
- D . It’s a written document outlining the detailed process of software development.
A
Explanation:
A test case is a set of conditions, inputs, and expected results used to determine whether a system under test behaves correctly and meets its specified requirements. It helps validate functionality and detect defects.
There is a test case that performs multiple verifications.
How can the test case be configured so that the execution stops when a verification fails?
- A . Set the property ContinueOnFailure of the first Verify activity to False.
- B . Use a Stop Job activity after each verification.
- C . Set the property ContinueOnFailure of the Verify activities to False.
- D . Use a Terminate Workflow activity after each verification.
C
Explanation:
To ensure that the test case stops execution when a verification fails, you should set the ContinueOnFailure property of the Verify activities to False. This way, any failed verification will halt the test case immediately.
According to the troubleshooting Test Manager tips, what is one of the ways to resolve the following issue?

- A . Duplicate the faulty test case within Studio.
- B . Re-link the faulty test case to the test set.
- C . Re-publish the project to Orchestrator.
- D . Unlink the automation in Test Manager.
C
Explanation:
The warning message indicates that the test cases were not available in the latest published package version. To resolve this, you need to re-publish the project to Orchestrator to ensure all test cases are included and executable.
What kind of changes can be made to test sets linked from Orchestrator in Test Manager?
- A . The description can not be edited, but the name and version can be edited in Test Manager.
- B . The name description, or version can not be edited. Any changes need to be made in Orchestrator.
- C . The name can not be edited, but the version and description can be edited in Test Manager.
- D . The version can not be edited, but the name and description can be edited in Test Manager.
D
Explanation:
When test sets are linked from Orchestrator in Test Manager, the version cannot be edited in Test Manager. However, the name and description of the test set can be modified within Test Manager to support better project documentation or categorization.