UiPath UIPATH-ADPV1 Practice Exams
Last updated on Oct 22,2026- Exam Code: UIPATH-ADPV1
- Exam Name: UiPath (ADPv1) Automation Developer Professional Exam
- Certification Provider: UiPath
- Latest update: Oct 22,2026
Consider testing a workflow that computes the sum of two numbers having the data driven test data from the Excel file below:

Expanding the functionality of the workflow to compute the sum of three numbers, the data needs to be updated as well to accommodate the new scenario:

What are steps to do that?
- A . Click Right on the Test Case and select Update Test Data
- B . Click Right on the Test Case and select Add Test Data.
- C . Click Right on the Test Case and select Refresh Test Data
- D . Click Right on the Test Case and select Remove Test Data.
Which command in the UiPath installation folder configures the UIPath.RemoteDebugging.Agent utility on a Windows robot to accept remote debugging requests from Studio?
- A . UiPath.RemoteDebuqqinq.Aqent.exe start -port -password -verbose
- B . UiPath-RemoteDebuqqinq.Aqent.exe enable -port -password -verbose
- C . UiPath.RemoteDebuqqinq.Aqent.exe enable -port -username -password -verbose
- D . dotnet ./UiPath.RemoteDebuqqinq.Aqent.dll enable -port -password -verbose
In a UiPath State Machine workflow, which section of State activity is used to specify conditional/triggers logic and multiple outgoing transitions in a state machine?
- A . Entry
- B . Transitions
- C . Triggers
- D . Exit
DRAG DROP
What is the correct execution order of the State activity sections?
instructions: Drag the Description found on the "Left" and drop on the correct Execution Order found on the "Right"

How would you define a linear process in UiPath?
- A . The steps of the process refer to the execution of steps in a sequential manner, where each subsequent step depends on the successful completion of the previous step.
- B . The steps of the process are performed multiple times, but each time different data items are used.
- C . The steps of the process repeat multiple times over different data items. However, the automation design is such that each repeatable part processes independently.
- D . The process steps are performed only once. If the need is to process additional data, then the automation must execute again.
Which of the following demonstrates the correct syntax for using the Vb.Net "If" Operator?
- A . If(condition1, valueIfTrue) ElseIf(valueIfFalse)
- B . valueIfTrue If condition1 Else valueIfFalse
- C . If condition1 Then valueIfTrue Elself valueIfFalse
- D . If(condition1, valueIfTrue, valueIfFalse)
The following table is stored in a variable called "dt".

What will the value of the qty variable be after executing the Assign activity?

- A . 5
- B . 10
- C . 80
- D . null
Starting with UiPath Studio version 2022.10, what happens to dependencies that lack Windows compatibility when they are converted in a project?
- A . They are removed from the project.
- B . They are automatically resolved.
- C . They are replaced with compatible alternatives.
- D . They are marked as unresolved.
Which of the following describes the correct hierarchy of the elements in the Object Repository tree structure?
- A . Version, Application, Screen, Ul Element.
- B . Application, Version, Screen, Ul Element.
- C . Application, Screen, Ul Element, Version.
- D . Screen, Application, Version, Ul Element.
Which of the following statements is true about the existing UiPath Studio installation packages?
- A . The Attended Robot installation package installs only the UiPath Robot.
- B . The Unattended Robot installation package installs only UiPath Studio, Assistant, and Robot.
- C . The Attended Robot installation package installs only UiPath Studio, and Robot.
- D . The Automation Developer installation package installs only UiPath Studio, Assistant, and Robot.
