Complete the sentence. The purpose of the Preliminary Phase is to_______________.
- A . define the enterprise strategy
- B . describe the target architecture
- C . architect an Enterprise Architecture Capability
- D . identify the stakeholders and their requirements
Scenario:
Please read this scenario prior to answering the question
The ABC company specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. The company has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Manitoba. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturer’s design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. The company has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
The company has used T0GAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have adapted their Enterprise Architecture to closely follow the TOGAF 9 framework. All of the company’s enterprise architects have been trained and certified on TOGAF 9. Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Scenario
You are the Lead Architect for this activity.
You have been asked to recommend the best approach to adopt to address the Chief Engineer’s concern.
Based on TOGAF 9, which of the following is the best answer?
- A . You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization. You recommend that if a deviation from the contract is detected, the Manufacturing Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
- B . You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization. You recommend that if a deviation from the Architecture Contract is detected, the Manufacturing Architecture Board grant a dispensation ID allow the implementation organization the ability to customize the process to meet their local needs.
- C . You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization. You ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- D . You create an Architecture Contract to govern the implementation and migration process at each site. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. You then schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. Based on the results, you ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
D
Explanation:
Incorrect:
Not C: correct, but missing contract see 49.2.2..
Note:
* Dispensations
A dispensation is used as the mechanism to request a change to the existing architectures, contracts, principles, etc. outside of normal operating parameters; e.g., exclude provision of service to a subsidiary, request for unusual service levels for specific business reasons, deploy non-standard technology or products to support specific business initiatives.
Dispensations are granted for a given time period and set of identified services and operational criteria that must be enforced during the lifespan of the dispensation. Dispensations are not granted indefinitely, but are used as a mechanism to ensure that service levels and operational levels, etc. are met while providing a level flexibility in their implementation and timing. The timebound nature of dispensations ensures that they are a trigger to the Architecture Compliance activity.
Please read this scenario prior to answering the question
Your role is that of an Enterprise Architect In a company that develops wind turbines for use in wind farms. The company has multiple manufactunng facilities, in North America, Asia, and Europe. Each of these facilities supplies the power industry In Its region. Most of the facilities are wholly owned by the company, but those In Asia are jointly owned with local partners.
The company has a mature Enterprise Architecture practice supported by a cross-functional Architecture Board and uses the TOGAF standard.
The company recognizes that the long-term technical potential of wind energy can address the current global dependency on carbon fuels. In order to do so this will require wind turbines to be installed over large areas and in areas of higher wind resources. In particular offshore wind farms can contribute substantially more energy than land stationed turbines.
The research arm of the company has pioneered the development of an offshore wind turbine design, with an improved turbine blade and power system, that will produce up to 20% more energy. This new design is ready to go Into production.
As part of putting the new design into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated systems used to perform final assembly and quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the wortc needed to implement and deploy the new automated system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and a low blade failure rate.
Refer to the Scenario
You have been asked to recommend the best approach to address the Chief Engineer’s concern.
Based on the TOGAF Standard, Version 9.2. which of the following is the best answer?
- A . You would review the Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. Where applicable, you ensure that the contract is legally enforceable. You would schedule compliance reviews at key points in the assembly and quality assurance process to ensure that the work is proceeding in accordance with the Architecture Definition. All deviations from the contract should be reviewed by the Architecture Board, who would consider whether to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- B . You would create an Architecture Contract to manage and govern the implementation and migration process at each location. For wholly owned facilities, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For facilities jointly owned by local partners, you would ensure that the contract is legally enforceable. You would then ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the Implementation organization to customize the process to meet their local needs.
- C . You would create an Architecture Contract to govern the update to the automated system controller at each location. For facilities managed by partners, you ensure that it is a fully enforceable legal contract, and you would schedule additional compliance reviews at key points in the assembly and quality assurance process. These additional reviews would be for an initial period until no deviations from the contract occur. You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
- D . You would use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You would ensure that the quality of each completed turbine blade at each location is assessed, and any local change requirements identified, if necessary. You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
Which component within the Architecture Repository holds best practice or template materials that can be used to construct architectures?
- A . Architecture Capability
- B . Architecture Landscape
- C . Architecture Metamodel
- D . Governance Log
- E . Reference Library
In which Phase of the TOGAF ADM are the Architecture Roadmap and the Implementation and Migration Plan integrated with other change activity in the enterprise?
- A . PhaseA
- B . PhaseD
- C . PhaseE
- D . PhaseF
- E . PhaseG
In Phases B, C, and D of the ADM cycle the first step defined is to select reference models, viewpoints, and tools.
Which of the following is the next step in each of these phases?
- A . Conduct formal stakeholder review
- B . Create Architecture Definition Document
- C . Develop Baseline Architecture
- D . Perform gap analysis
- E . Resolve impacts across the Architecture Landscape
Which ADM phase includes establishing the Architecture Capability and definition of Architecture Principles?
- A . Phase B: Business Architecture
- B . Preliminary Phase
- C . Phase A: Architecture Vision
- D . Phase F: Migration Planning
- E . Phase C: Data Architecture
B
Explanation:
Reference: https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap02.html
Complete the sentence. Actions arising from the Business Transformation Readiness Assessment technique should be incorporated in the ___________
- A . Architecture Requirements Specification
- B . Implementation Governance Model
- C . Architecture Roadmap
- D . Implementation and Migration Plan
- E . Communications Plan
In which part of the ADM cycle do the earliest building block definitions start as abstract entities?
- A . Phase A
- B . Preliminary Phase
- C . Phases B, C, and D
- D . Phases G and H
- E . Phases E and F
A
Explanation:
Reference: http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap32.html
Which model within TOGAF is intended to assist with the release management of the TOGAF specification?
- A . The Capability Maturity Model
- B . The Document Categorization Model
- C . The Integrated Infrastructure Information Model
- D . The Organizational Model for Enterprise Architecture
- E . The Technical Reference Model