How should a Development Team deal with non-functional requirements?
- A . Ensure every Increment meets them.
- B . Make sure the release department understands these requirements, but it is not the Development Team’s responsibility.
- C . Handle them during the Integration Sprint preceding the Release Sprint.
- D . Assign them to the lead developers on the team.
Multiple Scrum Teams working on the same project must have the same Sprint start date.
- A . True
- B . False
What is the time-box for the Sprint Planning meeting?
- A . 4 Hours for a monthly Sprint.
- B . 8 Hours for a monthly Sprint.
- C . Monthly.
- D . Whenever it is done.
In the Sprint Planning meeting, the Product Owner and the Development Team were unable to reach a clear understanding about the highest order Product Backlog items. Because of this, the Development Team couldn’t figure out how many Product Backlog items it could forecast for the upcoming Sprint. They were able to agree on a Sprint Goal, however.
Which of the following two actions should the Scrum Master support? (Choose two.)
- A . Cancel the Sprint. Send the entire team to an advanced Scrum training and then start a new Sprint.
- B . Forecast the most likely Product Backlog items to meet the goal and create a Sprint Backlog based on a likely initial design and plan. Once the time-box for the Sprint Planning meeting is over, start the Sprint and continue to analyze, decompose, and create additional functionality during the Sprint.
- C . Continue the Sprint Planning meeting past its time-box until an adequate number of Product Backlog items are well enough understood for the Development Team to make a complete forecast. Then start the Sprint.
- D . Discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.
- E . Ask everyone to take as much time as needed to analyze the Product Backlog first, and then reconvene another Sprint Planning meeting.
Who is responsible for tracking the remaining work of the Sprint?
- A . The Development Team.
- B . The Scrum Master.
- C . The Project Manager.
- D . The Development Team is consultation with the Product Owner.
- E . The Product Owner.
Which three of the following are feedback loops in Scrum? (Choose three.)
- A . Sprint Review.
- B . Release Planning.
- C . Sprint Retrospective.
- D . Refinement Meeting.
- E . Daily Scrum.
The time-box for a Daily Scrum?
- A . Two minutes per person.
- B . 15 minutes.
- C . 15 minutes for a 4 week sprint. For shorter Sprints it is usually shorter.
- D . 4 hours.
- E . The same time of day every day.
Which of the following are true about the length of the Sprint? (Choose two.)
- A . The length of the Sprint should be proportional to the work that is done in between Sprints.
- B . It is best to have Sprints of consistent length throughout a development effort.
- C . Sprint length is determined during Sprint Planning, and should hold the time it will take to code the planned features in the upcoming Sprint, but does not include time for any testing.
- D . Sprint length is determined during Sprint Planning, and should be long enough to make sure the Development Team can deliver what is to be accomplished in the upcoming Sprint.
- E . All Sprints must be 1 month or less.
What two factors are best considered when establishing the Sprint length? (Choose two.)
- A . The organization has mandated similar length sprints.
- B . The level of uncertainty over the technology to be used.
- C . The frequency at which team formation can be changed.
- D . The risk of being disconnected from the stakeholders.
The Daily Scrum is an event that happens every day.
What would be three key concerns if the frequency were to be lowered to every two or three days? (Choose three.)
- A . Opportunities to insect and adapt the Sprint Backlog are lost.
- B . Impediments are raised and resolved more slowly.
- C . The Product Owner cannot accurately report progress to the stakeholders.
- D . Too much work is spent updating the Scrum board before the meeting.
- E . The Scrum Master loses the ability to update the Gantt chart properly.
- F . The Sprint plan may become inaccurate.