Which sourcing methods are required to identify the product flow through the network? Note: There are 3 correct answers to this question.
- A . Sourcing via Production
- B . Sourcing via Demand Prioritization
- C . Unspecified Sourcing
- D . Customer sourcing Rule
- E . Sorucing via Costs
How many different time levels can be selected within one planning view?
- A . Only time levels from the base planning level of selected key figures
- B . All time levels available in the time profile, restricted by global configuration parameter
- C . All time levels available in the time profile
- D . The number of time levels is restricted to four to avoid negative effects on performance
What are some of the key capabilities of SAP Integrated Business Planning for demand? Note: There are 3 correct answers to this question.
- A . Automated, exception- based processing
- B . Statistical analysis using the predictive analytics tools
- C . Determination of coefficient of variation (CV)
- D . Classifying demand into zones
- E . Embedded, on-the-fly demand analytics
What is the feature of the weighted average key figure calculation?
- A . The numerator of the calculation should be stored.
- B . The first parameter of the formula acts as a weight
- C . Attributes can be used in weighted average key figure calculation
- D . The numerator’s value should include multiplication by the weight.
Which processes are embedded in the sample planning areas SAP6 and SAP3?
- A . SAP6 Control Tower, and SAP3 Sales and Operations Planning and Supply Planning
- B . SAP6 Demand Planning and Sensing, and SAP3 Control Tower
- C . SAP6 Demand Planning and Sensing, and SAP3 Inventory Planning
- D . SAP6 Sales and Operations Planning and Supply Planning, and SAP3 Inventory Planning
What do you need to be aware of when using multiple pairs of key figures in one copy operator?
Note: There are 2 correct answers to this question.
- A . Copying multiple key figures can be processed sequentially
- B . Copying multiple key figures on different planning levels is not possible.
- C . Necessary source key figures values are disaggregated.
- D . Necessary target key figures value are disaggregated
Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are 2correct answers to this question
- A . Allocation planning
- B . Simple statistical forecast
- C . Multi-Level Supply Planning Heuristics
- D . SAP Product Lifecycle Management
Which Maintenance, Repair, and Overhaul (MRO) parts planning processes are included in SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question.
- A . Inventory Optimization
- B . Demand Driven Replenishment
- C . Demand Planning
- D . Supply Planning
- E . SAP Intelligent Asset Management
What are the possible Master Data Maintenance options for SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question
- A . The SAP IBP, add – in for Micorsoft Excel
- B . The Manage Master Data app
- C . The Planner Workspaces app
- D . The Planning Areas Model Configuration app
- E . The data Integration job app
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, add-infor Microsoft Excel, and you are receiving an error related to missing combinations.
How can you resolve this problem? Note: There are 2 correct answers to this question
- A . Use the Data Integration app to upload the missing combinations
- B . Use the Manage the master data app to create missing combinations
- C . Use the function New Planning Object in Excel UI to create missing combination
- D . Use the Copy Operator to create the missing combinations