Which phase of the project life cycle develops a consumable solution in a collaborative and incremental manner?
- A . Execution
- B . Construction
- C . Inception
- D . Transition
What is the Disciplined Agile principle of being pragmatic characterized by?
- A . Adapting lean methodologies when necessary
- B . Tailoring the organizational structure to the context
- C . Identifying when to be agile
- D . Being as effective as you can and continuously improving
What are the three phases common across project life cycles? (Choose three)
- A . Inspiration
- B . Modulation
- C . Construction
- D . Inception
- E . Transition
Which characteristic describes a good user story according to the f.N.V.E.S.T. mnemonic?
- A . Incremental
- B . Satisfactory
- C . Tangible
- D . Valuable
What arc Disciplined Agile milestones based on?
- A . Continuous integration
- B . Documentation
- C . Lean governance
- D . Lifecycle
What docs a well-written user story describe?
- A . The expectations of the product owner.
- B . The needs of all users.
- C . The customers’ perspective.
- D . A fixed outcome.
A team has completed the work in their Aeration backlog earlier than expected.
There is still three days left of the iteration, what should the team do now?
- A . Work on non-critical tasks until the product owner can assign them more work.
- B . Work with the product owner to pull more work from the product backlog into their iteration backlog.
- C . Report the differences in completion time so the next iteration can be planned more efficiently.
- D . Wait for the other groups to complete their work prior to doing anything else.
What is the role of the product owner?
- A . Coordinate the product.
- B . Inspect the product.
- C . Build the right product.
- D . Organize the product team.
Which approach is described as an agnostic hybrid technique that draws upon many different ideas?
- A . Agile
- B . Lean
- C . Disciplined Agile
- D . Iterative
A Minimum Viable Product (MVP) is a product with just enough features to satisfy early customers and?
- A . Provide feedback for future product development.
- B . Is used for demonstration only.
- C . Will be the last iteration of development.