What does ISO 9001 mean?
- A . A guideline for improving a quality management system.
- B . It is a guideline for auditing quality management systems.
- C . Defines basic principles and terms of quality improvement.
- D . Specifies requirements on a quality management system. Means there is quality management in place.
Which diagram describes the following scenario: "Answer OCEB ― BPM Fundamental test questions for a maximum duration of 4 hours allowed."
A)

B)

C)

- A . Option A
- B . Option B
- C . Option C
Pizza Co. just assigned its VP Operation as the "owner" of the "Pizza Delivery process".
Which of the following statements should be part of the assigned responsibilities?
- A . Discovery & modeling of the process.
- B . Analysis of process potential problems/failures.
- C . Performance of the process.
- D . Deployment of corrective actions.
In BPMM, how is a Maturity Levels measured?
- A . Through the implementation of a measurement-based strategy focusing on process improvement
- B . By the achievement of the goals that are contained in the set of process areas
- C . By the achievement of each maturity level
- D . With the collection of all process performance measures
At first a customer wants to book a hotel. Then he wants to book a flight and a car, or only a car or only a flight.
Which diagram describes this situation?

- A . Option A
- B . Option B
- C . Option C
- D . Option D
Which statement describes a process goal, for the “Contact center" process?
- A . Customers orders are tracked and reported to management.
- B . Customers are offered add on or special offerings to complete their order.
- C . Customers orders are properly captured and sent to the appropriate outlet.
- D . Customer calls are reviewed for quality management.
Which one is a collection of best practices for IT management and controlling?
- A . SCOR
- B . Six Sigma
- C . COBIT
- D . TPS
Which level of process modeling is used to provide requirements for an IT implementation of a business process?
- A . Descriptive modeling
- B . Software modeling
- C . Executable modeling
- D . Analytical modeling
Which one of these statements is allowed for a Sequence Flow?
- A . A Sequence Flow can cross the boundaries of a Pool.
- B . A Sequence Flow can connect an Activity outside a Group to another Activity within a group.
- C . A Sequence Flow can have a Catch Compensation Intermediate Event as its source.
- D . A Sequence Flow can cross the boundaries of a Sub-Process.
Which of the following statements refers to a benefit of the APQC’s Process Classification Framework (PCF)?
- A . The outcome is the result you desire
- B . The input is a factors pieces needed to create the outcome
- C . Eliminate waste and none value added (NVA) activities
- D . Enables the best kind of benchmarking performance and metrics