DRAG DROP
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

DRAG DROP
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

HOTSPOT
A company that assembles packaging material uses Dynamics 365 Supply Chain Management.
The glue that is used in assembly has run out of stock and will not be back in stock as expected. Another adhesive must be substituted for the glue. This will affect orders in planning as well as production orders that have started.
You need to ensure that the substitute adhesive is used in production until the glue is back in stock.
Which configuration should you use for each requirement? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

HOTSPOT
Background
Adatum Corporation is a multi-entity corporation located in Seattle, Washington in the United States. The company is a leading producer of specialty cakes and cookies. The company also manufactures specialty chocolates that use ethically sourced ingredients from around the world. The company plans to launch a new product line of organic chocolates later this year.
Adatum plans to implement Dynamics 365 Finance and Dynamics 365 Supply Chain Management to
manage financials, inventory, and manufacturing capabilities across the entire organization.
Current environment. Distribution
• Manufactured products are stored at the distribution warehouses until they are shipped to customers.
• Individually branded pre-packaged cake and cookie mixes are supplied to specialty cafes and restaurants. The mixes are shipped directly to the cafes and restaurants from the production factories.
• The company maintains a fleet of trucks and also subcontracts shipments between the factories and warehouses to outside vendors.
Current environment. Production
• The mixes and specialty chocolates are based on standard recipes that use precise ingredient ratios. There are strict rules around ingredient substitutions.
• All mixes use one of three base recipes as their foundation: BaseA, BaseB. and BaseC. Additional ingredients, spices, and flavorings are then added to make the final product.
• BaseA and BaseB are made in large batches and stored until they are used in the other mixes.
• Mixes with BaseA have a shelf life of six months due to the type of flour it uses.
• Specialty chocolates are manufactured only during the holiday season.
• Specialty desserts are offered during the holiday season. This year, customers may specify additional icing colors and cake layers when placing orders. Depending on the popularity of two of the new colors, they may be offered the next year.
• Cocoa oil that is extracted during the production of some of the specialty chocolates is used in the BaseB foundation mix.
• Cleaning and setup of machinery between products has been causing delays in production.
• Prices of raw ingredients such as sugar can fluctuate greatly depending on seasonal and worldwide demand.
• To properly record profitability, ail raw materials use the first in, first out (FIFO) costing method, while finished products are recorded at standard costs.
• Large fluctuations have been occurring at month end in costs reported due to the inability to track production runs that span from month-to-month.
• Leftover flour and sugar from production runs are collected, packaged, and donated to local food banks if the amount is too small to use in other runs.
Requirements. Production
• To maintain Adatum’s certification as a manufacturer of ethically sourced ingredients, the traceability of every ingredient in all products to their source must be tracked.
• All products must be randomly tested for adherence to quality standards for ingredient makeup and weight.
• Similar recipes must be able to be produced in succession to limit machinery cleaning and setup times.
• All costs must be tracked for each production run and be able to be reconciled at the end of the monthly accounting cycle, including any work in process (WIP) costs and donations.
• The organic chocolate line must be set up. The ingredients cannot be mixed with non-organic ingredients in inventory.
Requirements. Warehouse
• Mixes are generally stored and sold in 16-ounce bags. Some quantities are sold and distributed in 5. 10. and 20-gallon containers to large restaurants.
• Each mix has a single unique item number and is tracked per batch produced.
• Specialty chocolate products must be stored in climate-controlled areas of the warehouse.
Issues
• QA TesterA discovers during a random test that the batch of a mix does not contain the necessary amount of IngredientB.
• VendorZ, who transports finished goods from PlantA to Warehouses, is consistently late picking up product.
• OperatorA must consolidate partial mix batch group runs into saleable package quantities.
• UserB must set up the mix items.
• UserC learns that mixes containing BaseA have been stamped with a batch date from the flour vendor and is not being calculated from the mix manufacturing date. The mixes from the past month that might be impacted need to be identified and the calculation needs to be corrected.
• UserD must update the costs of finished goods. Accounting wants labor calculated in WIP based on how much time an individual spends performing the operation, as well as the finished goods to post to a specific different ledger account.
• UserE must set up and maintain the cost of sugar.
• UserF must decrease downtime for the machinery.
• UserG must plan the specialty desserts for the current holiday season.
You need to resolve the issue for UserB.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
- A . Create a catch weight item.
- B . Set up configuration and weight for partial visibility.
- C . Create a product master with predefined variants for ounces and boxes.
- D . Set up configuration and weight for full visibility.
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
The company requires that employees register time against each machine on the shop floor.
You need to configure the system so that employees can register time.
Which two configurations must be set up? Each answer represents a partial solution. NOTE: Each correct selection is worth one point.
- A . time registration workers
- B . registration work ow
- C . machines as a resource
- D . electronic timecard parameter
A company uses Dynamics 365 Supply Chain Management for Process manufacturing.
You are reviewing the planned production orders for the next two weeks. There are several production orders for the same product. One order is scheduled to run the week after another order.
You need to optimize the planned production orders.
What should you do?
- A . In Planned orders, combine the production orders.
- B . Rerun master planning. Select the dynamic plan with a coverage time fence of two weeks.
- C . Firm the orders.
- D . Rerun master planning. Select the static plan with a coverage time fence of two weeks.
You are responsible for product and formula maintenance for a paint manufacturer. You create a formula for white paint and add its lines.
When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately.
You need to set up the formula line for the pigment.
Which formula feature should you use?
- A . Pegged supply
- B . Step consumption
- C . Scalable
- D . Variable
You are using the manufacturing execution module in Dynamics 365 Supply Chain Management.
License plate labels must be printed for products in the Report as finished step.
You need to use the manufacturing execution functionality that meets this requirement.
What should you use?
- A . Operations schedules
- B . Job card terminal
- C . Load planning workbench
- D . Report BOMs as finished
A company manufactures high performance bicycles.
The bicycles come in several different preconfigured models. Customers can also purchase custom configurations. Several add-ons are dependent on other accessories in order to be installed.
You need to set up the system to handle the different product configurations.
What should you do?
- A . Create an expression constraint.
- B . Create a phantom BOM.
- C . Create a co-product.
- D . Create a batch version.
DRAG DROP
A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.