Microsoft MB-330 Practice Exams
Last updated on Oct 22,2026- Exam Code: MB-330
- Exam Name: Microsoft Dynamics 365 Supply Chain Management Functional Consultant
- Certification Provider: Microsoft
- Latest update: Oct 22,2026
A company manufactures and sells speaker boxes. The speaker boxes can be silver or black with a basic or upgraded wiring harness assembly.
The speaker box must be created in the item master so that the variables for colors and harness type can be assigned at order entry.
You need to create a new item that supports multiple variables.
What should you do?
- A . Create a new product. Select predefined variant as the configuration technology.
- B . Create a new product master. Select constraint-based configuration as the configuration technology.
- C . Create a new product. Select constraint-based configuration as the configuration technology.
- D . Create a new product master. Select predefined variant as the configuration technology.
A manufacturing company produces finished goods that contain raw materials that are costed using first-in, You need to set up a costing version to support planned costs of the finished goods.
What should you configure in the costing version? Select only one answer.
- A . costing type to standard and block activation to yes
- B . costing type to planned and block activation to yes
- C . costing type to planned and block activation to no
- D . costing type to standard and block activation to no
A manufacturing company produces finished goods that contain raw materials that are costed using first-in, You need to set up a costing version to support planned costs of the finished goods.
What should you configure in the costing version? Select only one answer.
- A . costing type to standard and block activation to yes
- B . costing type to planned and block activation to yes
- C . costing type to planned and block activation to no
- D . costing type to standard and block activation to no
You need to set up financial components for the new items.
Which two actions should you perform? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
- A . Assign items to a FIFO item model group.
- B . Assign the raw materials to a standard cost item model group. Assign finished goods to a FIFO item model group.
- C . Create item model groups for raw materials and finished goods by using different ledger accounts. Assign items to these groups.
- D . Assign raw materials to a standard cost item group. Assign finished goods to a FIFO item group.
- E . Create item groups for raw materials and finished goods by using different ledger accounts. Assign items to these groups.
A company that uses standard cost agrees to a purchase price of raw materials from a vendor for a one-year period.
You create the cost for the annual time frame to run bill of materials (BOM) calculations.
You need to ensure that the cost does not change for the raw materials within the annual period.
Which two actions should you perform? Select all answers that apply.
- A . Set the Block field to Yes on the Costing version.
- B . Set the Block activation field to Yes on the Costing version.
- C . Create a pending cost with the annual date range.
- D . Activate the pending cost and set the from date to the subsequent year
- E . Create a pending cost and set the from date to the subsequent year.
A manufacturing company uses 365 Supply Chain Management.
The procurement manager updates the minimum stock levels by using tie safety stock journal The manager encounters a setup error while calculating the proposal tr the minimum inventory level by using the service level option
You need to identify the cause of the error.
What is cause of the error?
- A . The Multiplication factor value was left blank
- B . The use the calculated minimum quantity the new minimum quantity option was not used.
- C . The Lead time margin was left blank
- D . The Calculate standard deviation option was not used while creating the journal lines.
- E . Safety stock journal lines were created by including the current month’s transactions
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A vendor is offering a rebate program on bottles of wine that have purchase orders placed within a month. There is a $5.00 rebate on the purchase of 10-100 bottles and a $6.00 rebate for the purchase of 101-200 bottles. Customers can purchase wine by the bottle or by the case. Discounts apply to all varieties of wine sold by the vendor.
You need to create a vendor rebate agreement to ensure that the correct rebate amount is claimed at the end of the month.
Solution: On the rebate agreement, specify each item group assigned to wine. Add a rebate line break of quantity 10-100 and a second rebate line break of quantity 101-200.
Does the solution meet the goal?
- A . Yes
- B . No
A company uses the built-in master planning engine but plans to use Planning Optimization instead. You enable auto-firming. You need to ensure that planned orders are firmed within the current month.
What should you do?
- A . Set the firming time fence to one month plus issue margin.
- B . Set the firming time fence to one month plus receipt margin
- C . Set the firming time fence to one month plus lead lime rf the while is greater than one week.
- D . Set the firming time fence to one month
- E . Set the firming time fence to one week plus lead time if the lead time is less than one week.
A company uses the built-in master planning engine but plans to use Planning Optimization instead. You enable auto-firming. You need to ensure that planned orders are firmed within the current month.
What should you do?
- A . Set the firming time fence to one month plus issue margin.
- B . Set the firming time fence to one month plus receipt margin
- C . Set the firming time fence to one month plus lead lime rf the while is greater than one week.
- D . Set the firming time fence to one month
- E . Set the firming time fence to one week plus lead time if the lead time is less than one week.
A company uses Planning Optimization. The company uses the product lifecycle state setup to exclude some items from planning. Items may exist in more than one warehouse.
What configuration is required so that Planning Optimization excludes these items? Select only one answer.
- A . Planning Optimization will respect the lifecycle state if it is enabled from Lifecyle Services.
- B . The items will respect the lifecycle state if manual planning on the warehouse setup is set to No.
- C . The items will respect the lifecycle state if manual planning on the warehouse setup is set to Yes.
- D . The product lifecycle state must be set up on the items only.
- E . Planning Optimization will respect the lifecycle state if it is enabled from Feature management.