You are currently defining a release strategy for an app, named APP-01.
The strategy should allow you to keep the time it takes to deploy new releases of the app to a minimum. The strategy should also allow you to roll back in the shortest time required.
Which of the following is the release strategy you should use?
- A . Red/Black deployment
- B . Rolling deployment
- C . גBig Bangג deployment
- D . Canary deployment
You have a project in Azure DevOps named Project1.
You implement a Continuous Integration/Continuous Deployment (CI/CD) pipeline that uses PowerShell Desired State Configuration (DSC) to configure the application infrastructure.
You need to perform a unit test and an integration test of the configuration before Project1 is deployed.
What should you use?
- A . the PSScriptAnalyzer tool
- B . the Pester test framework
- C . the PSCodeHealth module
- D . the Test-DscConfiguration cmdlet
You have a project in Azure DevOps named Project1.
You implement a Continuous Integration/Continuous Deployment (CI/CD) pipeline that uses PowerShell Desired State Configuration (DSC) to configure the application infrastructure.
You need to perform a unit test and an integration test of the configuration before Project1 is deployed.
What should you use?
- A . the PSScriptAnalyzer tool
- B . the Pester test framework
- C . the PSCodeHealth module
- D . the Test-DscConfiguration cmdlet
You have an Azure subscription.
You use Bicep templates to deploy websites and Azure SQL infrastructure.
You need to automate the deployments by using Azure Pipelines and a self-hosted agent that runs on two virtual machines. The solution must minimize administrative effort.
What should you do first?
- A . Create a service principal.
- B . Create an Azure Automation account.
- C . Create a user-assigned managed identity.
- D . On each virtual machine, enable a system-assigned managed identity.
HOTSPOT –
You have a project in Azure DevOps that contains a release pipeline. The pipeline contains two stages named QA and Prod. QA deploys code to an Azure web app named webapp1. Prod deploys code to an Azure web app named webapp2.
You need to ensure that code deployments to webapp2 are blocked if Azure Application Insights generates Failed requests alerts following the deployment of new code to webapp1.
What should you do for each stage? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

DRAG DROP –
You are configuring Azure Pipelines for three projects in Azure DevOps as shown in the following table.

Which version control system should you recommend for each project? To answer, drag the appropriate version control systems to the correct projects. Each version control system may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.

DRAG DROP
You plan to use Azure DevOps in development processes.
You identify the following issues with the existing development processes:
• Frequent discovery of bugs in production
• Increasing detection of bugs by customers
• Slow resolution of bugs and slow resumption of production
You need to implement Key Performance Indicators (KPIs) to track each issue.
Which KPI should you implement for each issue? To answer, drag the appropriate KPIs to the correct issues. Each KPI may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.

HOTSPOT
You have a project in Azure DevOps named Contoso App that contains pipelines in Azure Pipelines for GitHub repositories.
You need to ensure that developers receive Microsoft Teams notifications when there are failures in a pipeline of Contoso App.
What should you run in Teams? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

HOTSPOT
You use Git for source control. You have an app named App1.
In the main branch, you need to restore the third most recent revision of a le named App.exe.config.
How should you complete the command? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

DRAG DROP
You use Semantic Versioning (SemVer) as a dependency versioning strategy.
You perform changes to code as shown in the following table.

Which part of the version should you increment for each change? To answer, drag the appropriate parts to the correct changes. Each part may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.