An organization has decided to outsource IT operations.
Which of the following should be the PRIMARY focus of the information security manager?
- A . Security requirements are included in the vendor contract
- B . External security audit results are reviewed.
- C . Service level agreements (SLAs) meet operational standards.
- D . Business continuity contingency planning is provided
Which of the following trends would be of GREATEST concern when reviewing the performance of an organization’s intrusion detection systems (IDSs)?
- A . Increase in false positives
- B . Increase in false negatives
- C . Decrease in false negatives
- D . Decrease in false positives
Which of the following analyses will BEST identify the external influences to an organization’s information security?
- A . Business impact analysis (BIA)
- B . Gap analysis
- C . Threat analysis
- D . Vulnerability analysis
The BEST way to identify the risk associated with a social engineering attack is to:
- A . monitor the intrusion detection system (IDS),
- B . review single sign-on (SSO) authentication lags.
- C . test user knowledge of information security practices.
- D . perform a business risk assessment of the email filtering system.
After a server has been attacked, which of the following is the BEST course of action?
- A . Initiate incident response.
- B . Review vulnerability assessment.
- C . Conduct a security audit.
- D . Isolate the system.
Which of the following is the MOST appropriate metric to demonstrate the effectiveness of information security controls to senior management?
- A . Downtime due to malware infections
- B . Number of security vulnerabilities uncovered with network scans
- C . Percentage of servers patched
- D . Annualized loss resulting from security incidents
Once a suite of security controls has been successfully implemented for an organization’s business units, it is MOST important for the information security manager to:
- A . hand over the controls to the relevant business owners.
- B . ensure the controls are regularly tested for ongoing effectiveness.
- C . perform testing to compare control performance against industry levels.
- D . prepare to adapt the controls for future system upgrades.
Which of the following defines the MOST comprehensive set of security requirements for a newly developed information system?
- A . Risk assessment results
- B . Audit findings
- C . Key risk indicators (KRIs)
- D . Baseline controls
Which is the BEST method to evaluate the effectiveness of an alternate processing site when continuous uptime is required?
- A . Parallel test
- B . Full interruption test
- C . Simulation test
- D . Tabletop test
Following a breach where the risk has been isolated and forensic processes have been performed, which of the following should be done NEXT?
- A . Place the web server in quarantine.
- B . Rebuild the server from the last verified backup.
- C . Shut down the server in an organized manner.
- D . Rebuild the server with relevant patches from the original media.