Huawei H35-581_V2.0 Practice Exams
Last updated on Oct 22,2026- Exam Code: H35-581_V2.0
- Exam Name: HCIP-5G-RNP&RNO V2.0
- Certification Provider: Huawei
- Latest update: Oct 22,2026
The gNB triggers the UE to enter the deactivated state through the RRC release message. Which of the following are the parameters contained in the message? (Multiple choice)
- A . I-RNTI
- B . T380
- C . RNA ID
- D . Reason for release
If which event based on frequency priority is reported, the measurement based on frequency priority A4 will be stopped?
- A . A4
- B . A2
- C . A5
- D . A3
Massive MIMO can achieve 3D beamforming, which means that it not only provides good coverage on the ground floor, but can also effectively cover high-rise buildings.
- A . True
- B . False
How many NR frequencies are broadcast at most in the SIB24 system message for E-UTRAN to NG-RAN cell reselection?
- A . 8
- B . 16
- C . 32
- D . 64
NR logical channels are divided into control channels and service channels according to the type of transmitted data.
- A . True
- B . False
Which of the following channels/signals support dynamic power control? (Multiple choice)
- A . SSB
- B . TRS
- C . PDSCH
- D . PDCCH
Which of the following descriptions of UE dynamic power sharing in the protocol are correct? (Multiple choice)
- A . Dynamic power sharing may cause SCG release
- B . Dynamic power sharing may lead to insufficient power on the NR side
- C . Dynamic power sharing may lead to insufficient power on the LTE side
- D . UE supports dynamic power sharing, requiring power to meet NR side power requirements first
Which of the following numbers of RBs can be occupied by the NR PRACH channel in the frequency domain? (Multiple choice)
- A . 2RB
- B . 6RB
- C . 12RB
- D . 3RB
PDCCH dynamic power control, adaptively adjust the transmission power of the PDCCH dedicated to the far-point user based on the BL ER target value of the PDCCH.
- A . True
- B . False
4G and 5G idle state interoperability process through cell reselection
- A . True
- B . False