When using planning and design tools, which of the following statements is wrong regarding the layout of campus network cabinets?
- A . A has two views: logical cabinet and physical cabinet.
- B . Drag and drop to adjust the device position
- C . Modular switches support board location design
- D . The server cannot be placed in the cabinet.
When designing a WLAN solution, what is the minimum edge field strength of the coverage area that needs to be ensured?
- A . -90dBm
- B . -70dBm
- C . -75dBm
- D . -100dBm
Where can I modify the AP icon size and line thickness in the WLAN Planner tool?
- A . Planned resources
- B . Global settings
- C . Set display items
- D . Scene setting
Which of the following descriptions about dual-link backup networking is incorrect?
- A . Dual-link backup technology improves network reliability at important network nodes and ensures business stability
- B . The network service configuration on the active and standby ACs must be consistent.
- C . During the process of establishing primary and backup links between the AP and the primary and secondary ACs, the link established first must be the primary link.
- D . The standby AC must always be powered on.
What types of POC testing include? (Multiple Choice)
- A . Field testing
- B . Remote testing
- C . Hands-On Laboratory (HOL) Testing
- D . Institutional testing
In NCE-IP deployment, which of the following licenses are optional to load?
- A . Load Fl License
- B . Load NCE License
- C . Load FC License (Virtual Machine) License
In a multi-campus interconnection scenario, the correct description of Hub-spoke active-active design is (). (Multiple Choice)
- A . Based on the configured HUB spoke topology and the added site role, the AC automatically generates the corresponding routing policy for controlling the topology and sends it to the RR. The construction principle of the dual hub-Spoke topology is the same as the active and backup hub mode.
- B . Hub-spoke active-active mode realizes hub active-active based on active and standby hubs in different business network segments.
- C . When OSPF/BGP on the Hub LAN side introduces Overlay route advertisement, it needs to support configuring different Cost/MED values based on different IP prefixes.
- D . Supports dual-hub site networking. Each hub site can support one or two CPEs; dual-hub sites adopt a dual-active mode based on business network segments, with active/active modes for different network segments.
iMaster NCE – Campus V300RO22CO0 version, about Yunshan device management and control C configuration consistency function feature description, which is correct? (Multiple Choice)
- A . Manual configuration consistency check: Always supports manual triggering of full configuration consistency checks, as well as periodic consistency checks (daily/week/month). If there are differences in the checks, manual synchronization/reconciliation functions must be used to resolve configuration differences.
- B . First online configuration consistency check: When the device comes online for the first time, the controller triggers the full delivery of deployment configuration. Considering that the device cannot avoid multi-head configuration problems (such as configuring the device through local CLl), it is automatically triggered after the full delivery. Active differential discovery and synchronization operations synchronize the configuration configured locally on the device to the controller.
- C . Non-first-time online configuration consistency check: Same as first-time online configuration.
- D . Configuration consistency menu location: MaintenanceC>Configuration Maintenance>Data Consistency.
S switch V200R022 version, which of the following description about the S5X31(S)-S multi-rate switch is wrong?
- A . Supports 2G large cache to cope with high burst business traffic.
- B . It can be used as a central switch to support remote modules to achieve minimalist networking.
- C . Supports advanced features such as VxLAN and MPLS, Telemetry real-time data collection, and network operation and maintenance visualization; it can be widely used in scenarios such as medium-sized campus aggregation and small campus core.
- D . 3 power supply design, supports N+1 yuan, all ports support full supply of 802.3bt 90W PoE++ power supply, the maximum PoE output power of the whole machine can reach 2268W, adapting to the power supply needs of massive terminals.
Which is the built-in management software of OceanStor Pacific?
- A . Hmanager
- B . HService
- C . Device lanager
- D . DME IQ