Huawei H13-531_V3.0 Practice Exams
Last updated on Nov 16,2026- Exam Code: H13-531_V3.0
- Exam Name: HCIE-Cloud Computing (Written)
- Certification Provider: Huawei
- Latest update: Nov 16,2026
Which of the following understandings about Huawei Cloud stack node types are wrong? (Multiple choice)
- A . The eBackup Server&Proxy node uses EulerOS as the HostOS for deploying DPA software
- B . The bare metal server management node is the network traffic forwarding node of the bare metal server and implements the mapping from vlan to vxlan.
- C . KVM computing nodes are used to send general-purpose ECS instances to the ECS cloud service
- D . Network nodes use UVP as Host, vRouter, L3NAT and other services and VPN components are deployed in a virtualized manner
When an enterprise engineer uses Cloud Container Engine (CCE) to create a business workload, the system reports an error as shown in the figure below. Which of the following descriptions of the cause of the error is correct?
- A . The remote image repository uses an unknown or insecure certificate
- B . The number of public images pulled has reached the upper limit
- C . Unable to connect to the image repository, network is down
- D . The image is too large and the connection fails
HUAWEI CLOUD Stack Deploy is an automated installation tool for Huawei Cloud Stack that can provide a local delivery mode.
- A . True
- B . False
The business system and test system of an enterprise are both deployed using CCE clusters. In order to ensure the business performance and stability of the business system and reduce the time and cost of troubleshooting, the enterprise can set the QoS type of pdd to BestEffort when deploying the business system.
- A . True
- B . False
Kubernetes has a default image pull timeout. If there is no progress update for the image download within a certain period of time, the download action will be canceled. You can set the timeout by modifying the image-pull-progress-timeout parameter in the container engine Docker/Container configuration.
- A . True
- B . False
A customer deployed a CCE cluster and defined the DNS resolution policy of the container by configuring the /etc/resolv.conf file of the host. During use, it was found that the containers in the CCE cluster were very slow or timed out when resolving external domain names, and relevant configurations needed to be optimized. Which of the following descriptions of the user’s optimized configuration are wrong? (Multiple choice)
- A . Increase the timeout field in the resolv.conf file according to the time required for resolution.
- B . Set the CoreDNS policy in the CCE cluster to None
- C . Set the CoreDNS policy in the CCE cluster to ClusterFirst
- D . Change the ndots value in the resonlv.conf file to a value slightly larger than the number of "." in the domain name.
A maintenance engineer wants to conduct scheduled inspections or threshold inspections on FusionCompute and receive information via email. It is recommended that the maintenance engineer use () product to perform health checks on the system and enable the email sending function.
In the Rainbow process, in addition to Server-dAgent, there are also () components working.
Based on the integrated design principles of Huawei Cloud Stack, which of the following descriptions of storage service design are wrong? (Multiple choice)
- A . Heterogeneous SAN storage and Huawei SAN storage or Huawei distributed block storage are deployed in the same AZ
- B . When connecting to advanced services, one Volume Type is associated with multiple AZs
- C . When using Huawei distributed block storage as the backend storage pool, multiple AZs share one storage pool
- D . Deploy multiple Huawei distributed block storage clusters in the same AZ
A host group is composed of a group of computing servers with the same hardware configuration (CPU, memory) and connected to a unified shared storage, and is logically divided in the system by the administrator.
- A . True
- B . False