The Purchase Orders for Glenn Manufacturing Company were being copied by an employee and sent to four different departments yet only one department took an action based on the information in the PO. This is an example of ____________.
- A . External Failure Costs
- B . Appraisal Costs
- C . Internal Failure Costs
- D . Prevention Costs
For the data shown here a Belt suspects the three grades are supplying the same results.
Which statement(s) are true for proper Hypothesis Testing?
- A . The most appropriate Central Tendency to test is the Means
- B . An appropriate test to test Central Tendency is the Levene’s test
- C . An appropriate test to test Central Tendency is the ANOVA test
- D . An appropriate test to test Central Tendency is the Mood’s Median test
Having an Alpha of .05 and a Beta of .10 are the most common risk levels when running a Statistical test.
- A . True
- B . False
What is the Cycle Time, in minutes, for a process having a Throughput of 360 units per hour?
- A . 0.167
- B . 0.333
- C . 0.667
- D . 1.333
As part of a Visual Factory plan Kanban cards are created and utilized to identify areas in need of cleaning and organization.
- A . True
- B . False
When a Belt is analyzing sample data she should keep in mind that 95% of Normally Distributed data is within +/- 2 Standard Deviations from the Mean.
- A . True
- B . False
Long-term Data represents all the variation that one can expect within the subject process.
- A . True
- B . False
While management of a company must set the stage for all improvement efforts, which of these 5S’s is primarily driven by management?
- A . Straighten
- B . Sort
- C . Shine
- D . Sustain
Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:
- A . True
- B . False
Which of these are correct if Cpk Upper is 2.0 and Cpk Lower is 1.0?
- A . The process is not stable.
- B . The process is shifted to the left.
- C . Cpk must be reported as 1.0.
- D . The process Mean is 1.5.