A Belt experienced an Alpha of .05 and a Beta of .10 and knew these are the most common risk levels when running a Statistical test.
- A . True
- B . False
The Regression Model for an observed value of Y contains the term? o which represents the Y axis intercept when X = 0.
- A . True
- B . False
The ability to repeat the same measurement obtained with one measurement instrument used several times by one appraiser while measuring the identical characteristic on the same part is known as ____________.
- A . Repeatability
- B . Bias
- C . Linearity
- D . Reproducibility
The following Business Case is constructed properly. “During fiscal year 2008 the warranty returns for electric razor Model 312 were 1.3%. This represents a gap of 0.5% over target costing the company $18,500 per month.”
- A . True
- B . False
Examples of a Visual Factory include which of these? (Note: There are 2 correct answers).
- A . White outlines on floor for proper inventory placement
- B . Documented procedures with a numerical outline
- C . Bad/Good indications of gauge readings with red and green outlines
- D . Implementing a defect inspection device
The Six Sigma methodology had its origins at __________________ in the late 1980’s when William Smith coined the name for quality related work being done there.
- A . Motorola
- B . Allied Signal
- C . General Electric
- D . Honeywell
When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .
- A . Well documented
- B . Removed from the line
- C . Mistake proofed
- D . Highly visible
Which of these is Discrete data?
- A . Train arrived at 4:17 pm.
- B . Race car consumed 23 gallons of fuel.
- C . Of the 42 people on the bus, 12 went into the station.
- D . It took 3 hours and 32 minutes to complete the marathon.
The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.
- A . True
- B . False
Lean had its origins in the development and practice of the ___________ Production System.
- A . Honda
- B . Toyota
- C . Ford
- D . Motorola