DELL EMC D-VXR-DY-01 Practice Exams
Last updated on Nov 16,2026- Exam Code: D-VXR-DY-01
- Exam Name: Dell VxRail Deploy Exam
- Certification Provider: DELL EMC
- Latest update: Nov 16,2026
Question #41
An implementation engineer is working with a customer to prepare an external vCenter Server for a new VxRail deployment with customer-supplied VDS.
What vCenter objects must exist for a successful VxRail deployment?
- A . Datacenter, Cluster, and Custom VDS
- B . Datacenter, VxRail Management user, and Custom VDS
- C . Datacenter and VxRail Management user only
- D . Datacenter, Cluster, and VxRail Management user
Question #42
Refer to the Exhibit which shows a red box around a node PSNT.

What is a characteristic of the node marked by the red box?
- A . VxRail Primary node hosting the VxRail Manager VM.
- B . VxRail Primary node hosting the NTP and DNS servers.
- C . VxRail node hosting the DNS server.
- D . VxRail node that can be excluded from the initial VxRail build.
Question #43
What is used to control remote access to VxRail through SRS?
- A . VxRail Manager
- B . SRS VE Gateway
- C . vCenter
- D . Policy Manager
Question #44
During a node add procedure the new node cannot be discovered. A ping to the IPv6 address is responding.
What could be the cause of this issue?
- A . Only one network interface is up on the new node
- B . vSAN VLAN is not configured correctly
- C . Management VLAN ID is not set on the vmk0 interface
- D . Loudmouth process is not running
Question #45
View the Exhibit.

You are reviewing a VxRail Pre-Installation Site Checklist.
What conclusion can be drawn about the VxRail deployment from the exhibit?
- A . Top of Rack (ToR) switches will use two uplink ports
- B . Upstream switches will have two ISLs
- C . Two Top of Rack (ToR) switches will be used
- D . Two Upstream switches will be used