DELL EMC D-PEMX-DY-23 Practice Exams
Last updated on Oct 22,2026- Exam Code: D-PEMX-DY-23
- Exam Name: Dell PowerEdge MX Modular Deploy 2023 Exam
- Certification Provider: DELL EMC
- Latest update: Oct 22,2026
What is the minimum required HW configuration on the PowerEdge MX840c to POST?
- A . 1 processor in socket CPU1
1 memory module installed in socket A1
1 mezzanine card installed in Mezz A1 slot - B . 1 processor in each CPU socket
1 memory module installed per CPU socket
1 mezzanine card installed per CPU Mezz slot - C . 1 processor in any CPU socket
1 memory module installed in any socket
1 mezzanine card installed in any Mezz slot - D . 1 processor in socket CPU2
1 memory module installed in socket B1
1 mezzanine card installed in Mezz B1 slot
When a SAS IOM is power cycled, how much time does it take for the storage-IOM to display mapping information?
- A . 300 seconds
- B . 400 seconds
- C . 500 seconds
- D . 600 seconds
An implementation engineer prepares to install a PowerEdge MX7000.
Which serial cable do they use?
- A . USB-A –> Micro USB-B
- B . DB9 –> DB9
- C . USB-A –> USB-B
- D . DB9 –> Micro DB9
What is the benefit of C22 power inlet connectors on the MX7000 chassis?
- A . Meet higher power requirements
- B . C22 connectors are now standard on PowerEdge
- C . Allow for higher exhaust temperatures
- D . Enable linking together power supplies
What are the required components for a PowerEdge MX7000 Minimum to POST configuration?
- A . Two power supply units
One compute sled
One input output module
Two management modules
Five front fans and four rear fans - B . Two power supply units
One compute sled
One input output module
One management module
Four front and five rear fans - C . One power supply unit
One compute sled
One input output module
One management module
Two front fans and two rear fans
Which MX7000 feature allows an administrator to virtualize network WWN and MAC addresses?
- A . FlexAddress
- B . MX Scalable Architecture
- C . Identity Pool
- D . Virtual Top of Rack
A system administrator must obtain the correct rail and cable management to install a newly purchased MX7000 chassis into a rack.
What type of rail and cable management is supported?
- A . Sliding rail with strain relief bar
- B . Sliding rail with cable management arm
- C . Static rail with strain relief bar
- D . Static rail with cable management arm
An administrator is configuring a fully populated MX5016s storage sled to be accessed by four MX740c compute sleds. Each compute sled has an H745P Jumbo PERC installed. The disks in the storage sled are evenly distributed across all compute sleds using a Drive-Assigned storage configuration.
What is the maximum number of disks that each compute sled can detect from the MX5016s?
- A . 1
- B . 2
- C . 4
- D . 16
A technician is doing an initial MX7000 setup and wants to use KVM to configure the MM. KVM is not working.
What are the two causes of this issue?
(Select 2)
- A . The resolution set on MM is too high.
- B . MM is going through a reset.
- C . DP-to-DVI and DP-to-HDMI adapters are not supported.
- D . Mouse is not connected.
A customer has an MCM group consisting of four MX7000 chassis. They need to take the lead chassis down to perform maintenance.
How can the customer ensure that another chassis takes over the lead role in the MCM Group?
- A . The MCM group will elect a new lead chassis.
- B . Promote the backup lead chassis as the new lead chassis.
- C . The backup chassis will take the lead automatically.
- D . Promote the lead chassis to a passive chassis.