DELL EMC D-PE-FN-01 Practice Exams
Last updated on Oct 21,2026- Exam Code: D-PE-FN-01
- Exam Name: Dell PowerEdge Foundations v2 Exam
- Certification Provider: DELL EMC
- Latest update: Oct 21,2026
What is the maximum numberof iDRAC Virtual Console that can be run simultaneously?
- A . 4
- B . 7
- C . 6
- D . 5
A system administrator wants to remove and replace their operating system installation with a newer version. The administrator is using a Dell EMC Rack server with an iDRAC set up correctly.
Which tools are required to perform this operation?
- A . iDRAC, SupportAssist, and Virtual Console
- B . iDRAC, Virtual Console, and Virtual Media
- C . iSM, Repository Manager, and Virtual Console
- D . iDRAC, OMSA, and iSM
Where can a system administrator check and change power supply redundancy options on a Dell EMC PowerEdge server?
- A . UEFI BIOS
- B . iDRAC GUI
- C . PXE web interface
- D . Dell Power Manager interface
An administrator wishes to create a large complex RAID set for a write intensive application that balances performance and cost.
Which complex RAID Level should be used?
- A . RAID 5
- B . RAID 10
- C . RAID 50
- D . RAID 60
A customer requires a solution that allows data in RAM to be retained in case of power loss.
Which technology should be used?
- A . NVDIMM
- B . DDR DIMM
- C . NVMe
- D . SDRAM
What is a possible result of enabling high-performance settings on a Dell EMC PowerEdge Server?
- A . Increased power consumption
- B . Reduced power consumption
- C . Reduced airflow
- D . Increased hardware lifespan
Which network operating system is capable of supporting various workloads, such as database and printer access, and is based on open source code?
- A . Oracle
- B . Windows
- C . Linux
- D . ESXi
What are the first two steps to configure RAID from System Setup?
- A . Select Create Virtual Disk from the Main Menu.
Select Create Virtual Disks. - B . Select the PERC controller from the Device Settings.
Select Configuration Management. - C . Select Create Virtual Disks.
Select PERC controller. - D . Select Configuration Management.
Select Physical Disks.
What is a consideration for a hardware administrator who is physically installing multiple servers into a rack?
- A . Observe load requirements specified in documentation for the switch.
- B . Avoid unevenly loading the rack and creating a hazard.
- C . Ensure that the server can connect to Windows updates
- D . Ensure that the associated UPS can also power the top-of-rack switch.
A PowerEdge 14G server administrator has to shut down a server for urgent intervention.They don’t want to risk any data loss but don’t know the OS password.
What steps should be taken?
- A . Connect to iDRAC > Dashboard tab > click Power Off System in the dropdown menu
- B . Connect to iDRAC > Dashboard tab > click Graceful Shutdown
- C . Connect to Lifecycle Controller > Server management > Power Off System
- D . Connect to Lifecycle Controller > Server management > Send OS shutdown command