DELL EMC D-NWG-DS-00 Practice Exams
Last updated on Oct 22,2026- Exam Code: D-NWG-DS-00
- Exam Name: Dell Networking Design
- Certification Provider: DELL EMC
- Latest update: Oct 22,2026
What are two best practices when configuring iSCSI on a Dell OS10 switch?
- A . Use Edge Port and BPDUGuard.
- B . Use jumbo frames for increased bandwidth.
- C . Configure iSCSI as tagged VLAN.
- D . Flow Control RX should be off, and TX should be off.
What are two roles of a design architect?
- A . Communicating with sales and the delivery team
- B . Updating the PM and account team if additional orders are required
- C . Creating a new order list while planning for a network change
- D . Planning for upgrading an existing network device in a customer’s environment
What are two roles of a design architect?
- A . Communicating with sales and the delivery team
- B . Updating the PM and account team if additional orders are required
- C . Creating a new order list while planning for a network change
- D . Planning for upgrading an existing network device in a customer’s environment
A Design Architect is coordinating with a sales team to provide an example of the networking capabilities of a PowerEdge MX7000 for a customer.
Which networking resource meets this requirement?
- A . Demo Center
- B . GNS3
- C . Enablement Lab
- D . VMware Hands-on Labs
Which tool is typically used during the scoping phase to identify and prioritize networking project requirements?
- A . PowerSwitch
- B . FastList
- C . Unisphere
- D . Control Station
Which of the following are critical in planning for network segmentation using Layer 2 technologies?
- A . Subnetting and routing protocols
- B . VLAN segmentation and MAC address management
- C . Fibre Channel zoning and thin provisioning
- D . IP address allocation and subnetting
Which activity is the responsibility of the customer in the network replacement process?
- A . Create a deployment verification report.
- B . Create a validation plan.
- C . Create a detailed replacement plan.
- D . Create a detailed replacement plan.
What is a key benefit of utilizing PowerSwitch in the planning phase of a network design project?
- A . It automates the deployment of security patches
- B . It helps in optimizing switch configurations and performance
- C . It monitors traffic patterns in real time
- D . It reduces the number of network devices needed
What type of information is typically included in a Pre-Deployment Configuration Template?
- A . Device firmware versions
- B . IP addressing, device configurations, and security policies
- C . Network topology design
- D . Network traffic patterns
In the documentation process, a __________ template is used to record any issues encountered during the network’s operation and their resolution.
- A . Troubleshooting
- B . Pre-Deployment
- C . VLAN Assignment
- D . Topology Design