Which of the following are key elements in Layer 3 (L3) network planning?
- A . IP addressing
- B . MAC address table management
- C . Routing protocols
- D . Subnetting
Which of the following is NOT a typical role of a network design professional?
- A . Implementing firewalls and security policies
- B . Configuring individual network switches
- C . Designing a scalable network architecture
- D . Managing website content updates
What are two roles of the accounts team on a network project?
- A . The account technical sales representative works with the customer to prepare high-level design.
- B . An inside sales representative prepares high-level network design.
- C . Network sales representative prepares a high-level network design.
- D . The account executive is the leader of the accounts team.
What is the main focus when planning a network that supports Fibre Channel over Ethernet (FCoE)?
- A . Implementing VLANs for segmentation
- B . Consolidating SAN and LAN traffic over the same network
- C . Securing network traffic with firewalls
- D . Configuring access control lists (ACLs)
What is the primary role of a networking design professional in an enterprise environment?
- A . To configure individual network devices
- B . To install network cables
- C . To architect and design a scalable, efficient, and secure network infrastructure
- D . To monitor daily network traffic
Which tool is best suited for managing the budget and financial planning of a networking project?
- A . FastList
- B . Unisphere
- C . Financial Force
- D . Solve Online
Which tool is best suited for managing the budget and financial planning of a networking project?
- A . FastList
- B . Unisphere
- C . Financial Force
- D . Solve Online
When planning for OS10 licensing, what is an important consideration?
- A . Ensuring physical cabling paths are clear
- B . Confirming the required software features are licensed for each device
- C . Determining the power requirements of the data center
- D . Setting up Fibre Channel zoning
Match the following common deployment support tasks with the issues they address:
Task
Verifying cable connections
Checking IP address assignments
Running diagnostics with Solve Online
Reassigning VLANs
Issue
A) Resolves physical connectivity problems
B) Resolves IP conflicts
C) Identifies hardware or software malfunctions
D) Resolves segmentation issues
- A . Verifying cable connections – A Checking IP address assignments – B Running diagnostics with Solve Online – C Reassigning VLANs – D
- B . Verifying cable connections – D Checking IP address assignments – B Running diagnostics with Solve Online – C Reassigning VLANs – A
- C . Verifying cable connections – A Checking IP address assignments – B Running diagnostics with Solve Online – D Reassigning VLANs – C
- D . Verifying cable connections – B Checking IP address assignments – A Running diagnostics with Solve Online – C Reassigning VLANs – D
A customer purchased the following:
– Two Dell PowerSwitch S5248-ON Top of Rack Switches
– One Dell PowerSwitch S3148-ON Management Switch
– One PowerStore 500T with 4x 25 GbE ports
Which three VLANs should be configured on the PowerSwitch S5248-ON Top of Rack switches?
- A . SDNAS
- B . PowerStore Storage
- C . PowerStore Management
- D . Remote Discovery
- E . Internal Discovery